Description
Product Description:
Specification:
Model | SW-TL28-065 |
Input Power | 28W± 10% |
Input Voltage | 220-240VAC |
LED Current | 700mA |
Light Source | LUMINUS CXM-11 |
CCT | 3000K/4000K/5000K |
Beam Angle | 20–45° |
CRI | RA90 |
Luminous Flux(lm) 3000K(RA90) | 2090-2387LM± 10% |
Adjustable angle | 350° Horizontally 90° Vertically |
IP Rate | IP20 |
Surface color | Black/White |
Working ambient temperature | -10 ~ 30ºC |
Driver | Non-dimmable driver/Triac/DALI |
Package:
Item No. | SW-TL28-065 |
Box size | L129*W129*H267mm |
Carton size | L405*W405*H552mm |
Pieces per carton | 18 PCS |
Weight per carton | 20.5 KG |
Dimensions (unit: mm):
Light beam curves:
1.LUMINUS CXM-9 3000K RA90
Installation instructions:
! This product is suitable for indoor ONLY, not for outdoor. Don’t use in vibration, dust and high temperature environments to avoid fire or electric shock, etc.
! Avoid accidents, please TURN OFF the power before installing, cleaning and repairing the light.
! Avoid accidents, never cover the thermal insulation material and any other materials on the light.
! Never remove the internal structure of light, or we will invalidate warranty.
! If the light works abnormally, turn off the power immediately and contact with service center or professional technicians for inspecting to avoid accidents.
Safety for using:
1. Power must be turned off before installation. Fix it on the position of installation holes. Connection of the power supply must be sealed.
2. Please confirm the applicable power supply before using.
3. Make sure the switch is off before connecting to power supply in order to prevent electric shock.
4. Operation against rules may damage your property and do harm to your personal safety.
5. First estimate quantity of LED lights, then figure out the total power and design power supply according to the power rating of single flood light.
6. Dangerous high voltage or non-professional are not allowed to use the products.
7. Do not light the lamp more than 10 hours per day, it will reduce the lifetime of led lamps.
Trade terms:
1.Payment term: T/T 30% deposit after order confirmed, 70% the balance after goods ready before shipping, L/C at sight can be accepted.
2. Lead time: normally 7-15 working days after deposit received.
3. Samples: Can be ready in 3-5 working days once payment received.
4. Shipping port: Shenzhen, Mainland China.
5. Discounts are offered based on order quantities.
Our services:
1. Your inquiry on our products or prices will be replied once we checked it.
2. Well-trained and experienced staffs to answer all your queries in fluent English.
3. We can design base on your customized lighting with your logo.
4. Reasonable price with high quality will be offered.
5. Protection of your sales area, design ideas and all your private information.
Company Profile:
RFQ:
Q1: Can I have samples to test?
A: Yes,we are pleased to supply samples to test and check quality,mixed sample order is available.
Q2: Do you have any MOQ limited?
A: No
Q3: What’s the lead time?
A: Sample :3-5days. Mass production: 7-15days depend on the order quantity.
Q4:How do you ship the goods and how long does it take?
A: We usually ship by DHL,UPS,FEDEX,TNT. It usually takes 3-5days to arrive. By air,by sea
Q5: Do you offer guarantee for your products?
A: Yes, we offer two or three years guarantee for the products.
Q6: Do you accept Paypal or Western Union for sample order?
A: Yes, we accept Paypal and Western Union as payment term.