6mm Round Diffused Long Leads LED Diode

Model NO.
GS-0600R-360

Origin
China

HS Code
8517706000

Description

Product Advantages

1. Good thermal performance, hot channel width.

2. Lighting spot is uniformity.

3. Energy-saving environmental protection, a high light efficiency.

4. High brightness,low light attenuation,polished.

5. Easy to use, easy to install.

6. Strong antistatic ability.

 

Application:
It can be used for bedside lamp, wall lamp, aisle lamp, night lamp, landscape lamp, background lamp, lantern, nursing lamp, cabinet lamp, etc. Can be widely used in home, high-grade hotels, commerce, restaurants and entertainment, resorts, health and leisure clubs, landscape lighting, hospital.

LED Diodes:

1. We provide 3mm LED, 4mm LED, 5mm LED,6mm LED, 8mm LED, 12mm LED,etc.

2. Emitting color: White, red, yellow, blue, green,etc. 

3. Available Wavelength: 620nm-630nm, 585nm-595nm, 515nm-530nm,457.5nm-460nm(Tolerance of measurement of peaks Wavelength 5.0nm)

4.Available Temperature color: K1:2700-3000, K2:3000-3500, K3:3500-4500, K4:4500-5500 ,K5:5500-6500, K6:≥6500

5.Application: Lighting, Upholster, Project Building, Display, Traffic Light, etc.

6. Available Angle: 360deg

7.Superior performance in outdoor/indoor environment