Brsgl020 Efficiency LED Garden Use Solar Light

Model NO.
BRSGL020

Voltage
12V

Certification
CE, RoHS, CCC, ISO9001

Transport Package
Carton

Specification
CE, RoHS, ISO90001: 2008

Trademark
Borui

Origin
China, Mainland

HS Code
9505409000

Production Capacity
20000/Mouth

Description

 LED Garden Use Solar Light
Key Specifications/Special Features:
Solar module: 20 to 60Wp polycrystalline
Light pole: 3.5 to 5m common steel
Hot galvanized and plastic-sprayed
Controller: 12V, 5A light control, time control, temperature compensation, over-charge, over-discharge, revert and short circuit protect
Light source: 3 to 10W high luminance LED
Irradiance efficiency: 65 to 90lm
Storage battery: 26 to 45Ah maintenance-free Lead-acid storage battery
Working voltage: 12V
Working temperature: 35 to 65° C
Wind resistance: IP65
Working time: 8 to 12 hours/day

Rainy and cloudy days in session: 5 to 7 days
Payment Details:
Payment Terms:
Telegraphic Transfer (TT, T/T)
Minimum Order:
1 to 99 Pieces
Delivery Details:
FOB Port:
Shanghai
Lead Time:
10 – 20 daysFAQ 

1.Question : Are you a factory or trading company ? 
Answer: We are an SGS recognized OEM / ODM manufacturer factory with export license. We have an outstanding and experienced team made up of “A” player who have a passion for doing something great to create more value for customers world-wide.
 

2. Question :  Why choose cooperate with us ?  
Answer :     — Right people, Right product, Right price ;
                    — Company-wide customer awareness ;
                    — Reliable Quality and All components from world leading suppliers ;
                    — Cost-effective export infrastructure and total supply chain management ;
 

3. Question : How does your factory do regarding quality control ?  
Answer : Assuring Quality is our dignity and quality control engineers specially be responsible for quality checking in each process such as Incoming Quality Control , In Process Quality Control , Outgoing Quality Control , Environment Control, Product Traceability System , Internal Audits & Calibration, Equipment Control & Maintenance , Control of Non-Conforming Materials and etc.
 

4. Question : What is the average delivery time ?  
Answer : Most of the time, it would be around 1 week since after confirm receiving customers’ contract money. For mass production purchase order at big quantity, the delivery time could be discussed with each other case by case.